Clairmont Street and Sullivan Avenue Road Reconstruction, Watermain and Sewer Replacement
Share Clairmont Street and Sullivan Avenue Road Reconstruction, Watermain and Sewer Replacement on FacebookShare Clairmont Street and Sullivan Avenue Road Reconstruction, Watermain and Sewer Replacement on TwitterShare Clairmont Street and Sullivan Avenue Road Reconstruction, Watermain and Sewer Replacement on LinkedinEmail Clairmont Street and Sullivan Avenue Road Reconstruction, Watermain and Sewer Replacement link
The Clairmont Street and Sullivan Avenue Reconstruction Project involves the replacement of aging underground infrastructure and the reconstruction of the roadway within the downtown area of the City of Thorold. The existing watermain, sanitary sewer, and road infrastructure have reached the end of their useful service lives and have been identified as high-risk assets due to their age, material type, and overall condition.
Clairmont Street is located within Thorold's downtown core and extends from Front Street to Ormond Street. The project includes the replacement of the existing cast iron watermain with a new PVC watermain, replacement of the existing sanitaryContinue reading
The Clairmont Street and Sullivan Avenue Reconstruction Project involves the replacement of aging underground infrastructure and the reconstruction of the roadway within the downtown area of the City of Thorold. The existing watermain, sanitary sewer, and road infrastructure have reached the end of their useful service lives and have been identified as high-risk assets due to their age, material type, and overall condition.
Clairmont Street is located within Thorold's downtown core and extends from Front Street to Ormond Street. The project includes the replacement of the existing cast iron watermain with a new PVC watermain, replacement of the existing sanitary sewer with a new PVC sanitary sewer, and full road reconstruction. The roadway improvements will incorporate the Downtown Streetscape Master Plan, including enhanced pedestrian amenities, upgraded boulevard treatments, improved drainage, and roadway improvements intended to support the long-term revitalization of the downtown area.
Sullivan Avenue extends from Pine Street to Front Street. The project includes the replacement and upsizing of the existing watermain infrastructure to improve system reliability, water quality, and fire protection. The roadway will also undergo full reconstruction in accordance with the Downtown Streetscape Master Plan. Improvements include new curb and gutter, boulevard enhancements, upgraded pedestrian facilities, improved drainage infrastructure, and a reconstructed road structure designed to meet current municipal standards.
Upon completion, the project will improve the reliability and performance of critical municipal infrastructure, enhance public safety and accessibility, reduce future maintenance requirements, and contribute to the continued revitalization of downtown Thorold.
Clairmont Street and Sullivan Avenue Road Reconstruction, Watermain and Sewer Replacement has finished this stage
This project has been approved by City Council to proceed. We would like to hear your feedback here and at any future Public Information Centres.
We are in progress
Clairmont Street and Sullivan Avenue Road Reconstruction, Watermain and Sewer Replacement is currently at this stage
The Clairmont Street and Sullivan Avenue Reconstruction Project has been awarded to Alfred Beam Excavating Ltd., and a project kick-off meeting has been completed with the Contractor, Consultant, and City staff.
Work is anticipated to begin in summer 2026.
The City is also engaging with local businesses, residents, utility companies, and other stakeholders to communicate project details and minimize disruptions during construction.
The project is currently in the mobilization and pre-construction phase.
We are finished
this is an upcoming stage for Clairmont Street and Sullivan Avenue Road Reconstruction, Watermain and Sewer Replacement
The project has been finished and closed. We will include a summary of all contributions collected.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends