Hamilton Blvd., Ross St., and Thorold Ave. - Hydro Relocation and Road Reconstruction Project

Share Hamilton Blvd., Ross St., and Thorold Ave. - Hydro Relocation and Road Reconstruction Project on Facebook Share Hamilton Blvd., Ross St., and Thorold Ave. - Hydro Relocation and Road Reconstruction Project on Twitter Share Hamilton Blvd., Ross St., and Thorold Ave. - Hydro Relocation and Road Reconstruction Project on Linkedin Email Hamilton Blvd., Ross St., and Thorold Ave. - Hydro Relocation and Road Reconstruction Project link

The City of Thorold is reconstructing Hamilton Boulevard, Ross Street, and Thorold Avenue. Utility replacement is slated to begin in 2025 to allow for road reconstruction, and water main/storm sewer installation will follow in 2026. This project aims to renew aging underground and road infrastructure and improve overall system performance. The project includes the full reconstruction of Ross Street and Hamilton Boulevard, along with the installation of a new storm sewer to enhance drainage and the replacement of the existing water main to improve reliability and long-term service.

These infrastructure upgrades will modernize municipal services within the corridor, address drainage

The City of Thorold is reconstructing Hamilton Boulevard, Ross Street, and Thorold Avenue. Utility replacement is slated to begin in 2025 to allow for road reconstruction, and water main/storm sewer installation will follow in 2026. This project aims to renew aging underground and road infrastructure and improve overall system performance. The project includes the full reconstruction of Ross Street and Hamilton Boulevard, along with the installation of a new storm sewer to enhance drainage and the replacement of the existing water main to improve reliability and long-term service.

These infrastructure upgrades will modernize municipal services within the corridor, address drainage deficiencies, and support safe and reliable operation of the roadway for residents and road users.

The key aspects involved in this work will include, but not be limited to:

  • Upgrading the roadways to an urban cross-section, including drainage improvements and a new cul-de-sac
  • Installing new curbs and sidewalks
  • Installing a new sidewalk on the east side of Thorold Avenue
  • Replacing the asphalt roadway
  • Replacing the water main
  • Installing new storm sewers
  • Underground utility installations

Comments

Introduction message
You need to be signed in to comment in this Guest Book. Click here to Sign In or Register to get involved

Is it possible to get a proposed drawings in advance of the meeting to get better clarification. It’ll be difficult to be prepared with questions or concerns without it. Also, hydro was not completed in 2025 as stated in the information you provided.

Tabatha About 1 month ago

There are Hydro boxes on the east side? How far from the road will the side walks be ? . This means i will lose a lot of my parking in my drive way . One of the reasons i bought the home in

Lee About 1 month ago