The City of Thorold is undertaking the 2023 Rural Roads Resurfacing Program at three (3) locations within the city. The selected roads are shown in Table 1 below:
These roads are in a very poor state and have been identified for reconstruction to provide residents and the general public with continued access to other parts of the city. The decision to reconstruct these roads was based on the most recent engineering assessments and inspections completed by City staff.
The scope of work will include full pulverization of these roads, regrading, and top asphalt finishes with a double layer of tarContinue reading
The City of Thorold is undertaking the 2023 Rural Roads Resurfacing Program at three (3) locations within the city. The selected roads are shown in Table 1 below:
These roads are in a very poor state and have been identified for reconstruction to provide residents and the general public with continued access to other parts of the city. The decision to reconstruct these roads was based on the most recent engineering assessments and inspections completed by City staff.
The scope of work will include full pulverization of these roads, regrading, and top asphalt finishes with a double layer of tar and chip. Where applicable, gravel shoulders on each side of the road will be restored to match the elevation of the finished pavement.
The locations of these three (3) roads are shown on the map in the photos.