• Skip to main content
  • Jump to navigation
  • Search

IE10 and below are not supported.

Google Chrome Mozilla Firefox

Contact us for any help on browser support

South Main Street Bridge

You are here:

  • Home
  • South Main Street Bridge Eco-Park Environmental Assessment

Documents

  • document icon Thorold South Main Street Bridge- Existing Conditions Report
  • document icon 2021 RFP Eco Park Concept
  • document icon ARA-CHER South Main Street Pedestrian Bridge Thorold Final- April 16, 2020
  • document icon Port Robinson Image Boards
  • document icon Preliminary Design Report
  • document icon South Main Street Bridge- Existing Conditions
  • document icon South Main Street Bridge- Final
  • document icon Port Robinson- Concept Plans
  • document icon Port Robinson - Main Concept Plan
  • document icon Preferred Design Concept Plan- Constraint Mapping
  • document icon Preferred Design Concept Plan- Conceptual Masterplan
  • document icon Preferred Design Concept Plan- Perspective Rendering
  • document icon Meeting 1 Minutes- August 19, 2021 (126 KB) (pdf)
  • document icon Meeting 2 Minutes- August 24, 2021 (146 KB) (pdf)
  • document icon Meeting 3 Minutes- October 12, 2021 (121 KB) (pdf)
  • document icon Meeting 4 Minutes- October 20, 2021 (118 KB) (pdf)