Skip To

  • Skip to content
  • Jump to navigation
  • Search

Page Outlines

Loading...

    IE10 and below are not supported.

    Google Chrome Mozilla Firefox

    Contact us for any help on browser support

    South Main Street Bridge

    You are here:

    • Home
    • South Main Street Bridge Eco-Park Environmental Assessment
    Go Back

    Documents

    • document icon Thorold South Main Street Bridge- Existing Conditions Report
    • document icon 2021 RFP Eco Park Concept
    • document icon ARA-CHER South Main Street Pedestrian Bridge Thorold Final- April 16, 2020
    • document icon Port Robinson Image Boards
    • document icon Preliminary Design Report
    • document icon South Main Street Bridge- Existing Conditions
    • document icon South Main Street Bridge- Final
    • document icon Port Robinson- Concept Plans
    • document icon Port Robinson - Main Concept Plan
    • document icon Preferred Design Concept Plan- Constraint Mapping
    • document icon Preferred Design Concept Plan- Conceptual Masterplan
    • document icon Preferred Design Concept Plan- Perspective Rendering
    • document icon Meeting 1 Minutes- August 19, 2021 (126 KB) (pdf)
    • document icon Meeting 2 Minutes- August 24, 2021 (146 KB) (pdf)
    • document icon Meeting 3 Minutes- October 12, 2021 (121 KB) (pdf)
    • document icon Meeting 4 Minutes- October 20, 2021 (118 KB) (pdf)