Highway 20 Watermain Design and Environmental Assessment

Share Highway 20 Watermain Design and Environmental Assessment on Facebook Share Highway 20 Watermain Design and Environmental Assessment on Twitter Share Highway 20 Watermain Design and Environmental Assessment on Linkedin Email Highway 20 Watermain Design and Environmental Assessment link

The City of Thorold is undertaking the design of the new watermain on Highway 20 from Barker Parkway (the Roundabout) to Highway 58 (Davis Road).

Design and approvals are expected to be completed in 2025 with construction scheduled for 2027. This watermain will provide an additional point of connection to the Rolling Meadows Subdivision(s) and provide water to highway commercial lands along Highway 20.

Impacted property owners will be contacted by the contractor individually during the design as it relates to the location of new servicing.

The City of Thorold is undertaking the design of the new watermain on Highway 20 from Barker Parkway (the Roundabout) to Highway 58 (Davis Road).

Design and approvals are expected to be completed in 2025 with construction scheduled for 2027. This watermain will provide an additional point of connection to the Rolling Meadows Subdivision(s) and provide water to highway commercial lands along Highway 20.

Impacted property owners will be contacted by the contractor individually during the design as it relates to the location of new servicing.

Comments

Introduction message
You need to be signed in to comment in this Guest Book. Click here to Sign In or Register to get involved
Page last updated: 02 Oct 2024, 03:19 PM